Items to be included on the bid for the excavation are:
Excavator to perform all necessary excavation and grading as
per drawings and provide all equipment to complete the job.
Bid for your custom home to include all necessary equipment
and drag time for two trips,
Trees to be saved will be marked with red ribbon and are to
remain unscared and undamaged,
Foundation to be dug to depth marked at foundation corners and
to be 3 feet wider than foundation for accessibility. Not dug
too deep in order to pour footings and basement floor on stable
base.
Driveway area to be cleared of topsoil and cut to proper level.
Topsoil to be removed and saved at designated location.
All excess dirt to be hauled away by excavator.
All stumps and trees to be dug up and hauled away.
Grade level to be established by the builder who will also
furnish a survey of the lot showing the location of the
dwelling and all underground utilities.
Finish grade to slope away from the home.
Back fill foundation walls after waterproofing, gravel and
drain tile have been installed and inspected for the custom home.